🌎
ATD Geospatial
  • Table of Contents
  • Geospatial Read-Only
  • ArcGIS Online
    • Activating your ArcGIS Online account
    • Create Vector Tiles with Popups
    • ArcGIS Online Training Page
    • Updating Existing Web Style Published to AGOL
  • ArcGIS Pro
    • ArcGIS Pro Training Page
    • Working in ArcGIS Pro
  • FME
    • Getting Started
    • Working with datetime
    • Adding or Deleting columns in Socrata
  • Active Transportation
    • Bike Facilities Data Dictionary
    • Interim Projects Viewer Model
    • Strava Metro Data
    • Bike Rack Data Collection
    • Updated Bike Rack Data Collection
    • Bike Data Requests
    • Bike Route Steepness Point Generation
    • Level of Comfort Feature Service Update
    • Bike Map Processes
      • Updating Online Bike Route Vector Tiles
      • Updating Steepness Chevrons
      • Print Bike Map
      • Bike Map Data Sources/Paths
  • Arterial Management
    • Data Driven PHB Ranking
      • Data Structure
      • Attribute Schema
      • Data Collection / Processing
      • Analysis
    • School Zone Beacon Audit Map
    • Signal Intersection Aerials Map
  • Comprehensive Transportation Network
    • Active Transportation Edits to the CTN
    • CTN Data Dictionary
    • CTN Monthly Updates
      • 1. CTN Street Segment Update
      • 2. CTN Intersection Points Update
      • 3. Publishing CTN as Vector Tiles to AGOL
  • Parking Enterprise
    • Affordable Parking Program
    • Bike Parking Dashboard/Data Pull
    • Parking Inventory Management
      • Getting Started
      • Editing in MAINT
      • Relationship Classes
      • Attribute Schema
      • Domains
      • Attribute Rules
  • Signs - Markings - Banners
    • Markings GIS Maintenance
      • Getting Started
      • Standard Operating Procedure
        • Marking Types and Sub Types
        • Scenarios doing GIS QA
        • Specifications | In-House > GIS
        • Materials | In-House > GIS
        • Items | Contractor > GIS
      • Attribute Rules
        • Intersection ID
      • Domains
      • Attribute Schema
    • Signs GIS Maintenance
      • Attribute Rules
      • Attribute Schema
      • Domains
      • FGDB Topology
      • New/Removed Signs Workflow
      • Signs QC Process
  • SPEED LIMIT CHANGE PROJECT
    • Desktop App - Speed Limit Change
    • Collector App - Speed Limit Change
  • Miscellaneous
    • ArcGIS Collector App
    • Alan De Anda's G Drive
    • Capital Improvements Program (CIP) Digitization
    • Collector App Set-up - Troubleshooting
    • GIS Onboarding
    • Google Partner Account & Geodata Uploader
    • PNTS Shapefile Creation
    • Public Facing Links
    • Vision Zero Polygon Maintenance
    • TCAD/WCAD Land Values Data Process
    • ArcGIS Style Creation
  • Format Testing
    • AS
    • ZB
    • JC
    • DS
  • Special Events
    • Map Closures Project
    • SXSW GIS Support
      • Data
      • Maps
      • Spring Festival ATX Mobility Guide
      • Incident Tracking
    • AMANDA Street Events Update
    • Active Parking Permits
Powered by GitBook
On this page

Was this helpful?

  1. Signs - Markings - Banners
  2. Signs GIS Maintenance

Signs QC Process

This page outlines the QC process for verifying locations of installed, removed, and outlying sign features.

PreviousNew/Removed Signs WorkflowNextDesktop App - Speed Limit Change

Last updated 3 years ago

Was this helpful?

This documentation assumes you are working out of the project in the location below: ...\Signs\RAS_Data_Collection_Sign_Assets\Data_Collection_Processing\FeatureAlignment_WorkingMap

  • The map holds 4 different datasets Sign Assets, Asset Locations, RAS Driven Roads, and NearMap Imagery.

Data Background

Attributes in the Sign Assets and Asset Locations dataset are controlled by attribute rules that minimize the need to modify attributes for either layer.

The only features needing QC are marked as "QC Required" and are displayed as either an Orange, Blue, Yellow, or Red square depending on the type of QC needed.

All signs need to intersect an Asset Location point (Black Hexagon). All Asset Locations are generated where confirmed assets are presents (either through mapping or the install of a Pole).

QC Process

The goal of the QC process is to match the locations of new and removed signs to a pre-mapped official asset location point.

The only features needing QC are marked as "QC Required" and are displayed as either an Orange, Blue, Yellow, or Red square depending on the type of QC needed.

Due to the attribute rules in place, a sign location requiring QC will only need to be moved so that it intersects the correct location point.

Once sign point intersects the location point, a relationship will be established between the two features and the sign point status will automatically update to "QC Complete"