Specifications tab
Last updated
Last updated
SBOBRDGE
Symbol | Meaning |
---|---|
(Class: INV_IMG; Class Description: Engineering Investigation; Crew:???; Work Group: SBOIMG)
Example: 24-177753
(Class: TREE_WORK; Class Description: Tree Work; Crew:???; Work Group: SBOTREE)
REQUESTING_AGENCY
SHOP
CONTRACTOR
*TICKET_TYPE
*TICKET_COST
*PRUNING_19PLUS
(Class: DISTRICT_MAINTENANCE; Class Description: District Maintenance Work Log; Crew:DISTC1/DISTS/SBODISTN; Work Group: SBODISTC/SBODISTS/DISTN1)
Example:
ON_STREET
FROM_STREET
TO_STREET
*ACT_LENGTH_REPAIR (FT)
*ACT_WIDTH_REPAIR (FT)
*ACT_DEPTH_REPAIR (IN)
*ACT_AREA_REPAIR (SQFT)
*ACT_COUNT_REPAIR (EACH) (when have to do more than one cut)
REQUESTING_AGENCY
FLEX_FIELD_2
PICTURES_TAKEN
OTHER_ATTACHMENTS
*ATD MARKINGS
*TABS PLACED
*when repairs are needed and completed.
(Class:
INV_UTILITY_EXCAVATION; Class Description:
Utility Excavation Investigation; Crew:
UTILCONC; Work Group:
SBOUTIL)
ON_STREET
ACT_WIDTH_REPAIR (FT)
ACT_LENGTH_REPAIR (FT)
CUTTYPE-CONC
EST_WIDTH_REPAIR (FT)
EST_LENGTH_REPAIR (FT)
(Class:
UTILITY_EXCAV_CONCRETE; Class Description:
Utility Excavation - Concrete Work Log; Crew:
UTILCONC; Work Group:
SBOUTIL)
(Class:
BRIDGE_WORK; Class Description:
Bridge Work Log; Crew:?; Work Group:
SBOBRDGE)
HANDRAILING_REPAIR
(Class: THINSURFTRMT_WORK; Class Description: Thin Surface Treatment Work Log; Crew: SLCT2; Work Group: SBOSLCT2)
ON_STREET
FROM_STREET
TO_STREET
ACT_LENGTH_REPAIR (FT)
ACT_WIDTH_REPAIR (FT)
CRACK_SEAL_PROGRAM
PROPERTY_OWNER_NOTIFIED
REQUESTING_AGENCY
PICTURES_TAKEN
OTHER_ATTACHMENTS
ATD_MARKINGS
TABS_PLACED
(Class: THINSURFTRMT_WORK; Class Description: Thin Surface Treatment Work Log; Crew: SLCT2; Work Group: SBOSLCT2)
(Class: SEALCOAT_WORK; Class Description: Seal Coat Work Log; Crew: SLCT1; Work Group: SBOSLCT1)
ON_STREET
FROM_STREET
TO_STREET
CRACK_SEAL_PROGRAM
(Class: SEALCOAT_WORK; Class Description: Seal Coat Work Log; Crew: SLCT2; Work Group: SBOSLCT2)
ON_STREET
FROM_STREET
TO_STREET
CRACK_SEAL_PROGRAM
(Class:
SEALCOAT_WORK; Class Description:
Seal Coat Work Log; Crew:
SLCT2; Work Group:
SBOSLCT2ON_STREET
FROM_STREET
TO_STREET
CRACK_SEAL_PROGRAM
(Class: OVERLAY_WORK; Class Description: Overlay Work Log; Crew: MILL; Work Group: SBOMILL)
ON_STREET
FROM_STREET
TO_STREET
ACT_AREA_REPAIR (SQFT)
ACT_LENGTH_REPAIR (FT)
ACT_WIDTH_REPAIR (FT)
ACT_DEPTH_REPAIR (IN)
Dropdown available to search
Required (depending which CREW and service plan - see below or speak with DM, Supervisor or Superintendent)
Next page, add line